The basement use as car parking, ground floor utilize for commercial and first floor partly consists car park area.
Total build up area is approximately 36960m2.
The building is in-situ concrete frame on raft foundation, all suspended slabs are PT Slabs, external and internal partition Block walls with Plaster and Paint, RCC roof Slab.
The roof is dressed up with COMBO waterproofing system.